Riyadh, SA
Get SAME-DAY SHIPPING on most orders placed by 4pm local time.

Tools, parts, and supplies for your business™

Shopping Cart (0)
Add SAR 50.00 more for FREE Shipping!
🛒
Your cart is currently empty.
Explore our extensive industrial tools, plumbing, HVAC & building supplies catalog.
Start Shopping

PATTEX PL 150 Exterior Fix Solvent Technology-INSDM/CHMCLS/0119

Material Supply SKU #: Z-PATTEX-PL-150-EXTERIOR-FIX-SOL-2826

SAR 0.00
/ Each
In Stock — Ships Today
Delivery by tomorrow when ordered by 4PM
Free Shipping over SAR 200
365-Day Returns
Secure Checkout
Apply adhesive onto one of the surfaces: 1) In spots in order to smooth uneven surfaces, 2) in wave-like form for higher initial tack with wide surfaces or 3) in straight strands for smaller surfaces.  In case of outdoor use, apply vertical strands. n nOne surface should be porous to ensure a solid, secure bond because solvent has to evaporate. For two non porous substrates apply PL150 in vertical strands so that the solvent has the possibility to evaporate n nTo ensure proper bond, press firmly so that all surfaces are in contact with adhesive.
n
n

Surface preparation:

nEnsure surfaces to be bonded are clean and free of dust, grease or oil. Surfaces should not be visibly wet or continuously damp. n nSubstrates must be stable. Remove the dirt with the appropriate solvent or sand down surfaces and clean afterwards from the dust. Before application, mask off the adjacent area with foil or tape, if necessary n n
n
n
n
n

Adhesive application:

nApply adhesive onto one of the surfaces: 1) In spots in order to smooth uneven surfaces, 2) in wave-like form for higher initial tack with wide surfaces or 3) in straight strands for smaller surfaces.  In case of outdoor use, apply vertical strands. n nOne surface should be porous to ensure a solid, secure bond because solvent has to evaporate. For two non porous substrates apply PL150 in vertical strands so that the solvent has the possibility to evaporate n nTo ensure proper bond, press firmly so that all surfaces are in contact with adhesive. n n
n
n
n
n
Application temperature:
n-10 to +35 °C n n
n
n
n
n

Open time:

nApprox. 10 minutes n n
n
n
n
n

Drying time:

nAllow to dry overnight to ensure proper adhesion. Bond is fully dry after 48h. n n
n
n
n
n

Consumption

nApprox. 300 g/m² with full-surface application n n
n